Three Phase (25-30kW)User''s Manual

All work on the inverter must be carried out by qualified electricians. The device may only be operated with PV panels. The PV panels and inverter must be connected to the ground. Do not touch the

Sofarsolar SOFAR 1100TL Installation And Operating

Before opening the inverter, you should wait five minutes to ensure that the capacitor has been fully discharged.

a. After install the LUX GPRS/4G. open the inverter or converter.

After install the LUX GPRS/4G. open the inverter or converter. When the first time to install the GPRS or 4G, the LED of datalogger will light as follow:

Generic Switching off and re-start procedure for off grid and hybrid

Never attempt to start the inverter if battery power is not connected. Damage may occur if any attempt is made to start the inverter under solar, generator or utility power, without the presence of a battery

Solar PV Start Up & Solar PV Start Up

Turn of your PV Array DC isolator located adjacent to your inverter, if the inverter is more than 3 metres away from the main switch board, another isolator may be installed adjacent to the inverter.

Turning on, shutting down or restarting your inverter safely

Safely turn on, shut down, or restart your solar inverter with this step-by-step guide. Ensure proper operation and troubleshoot issues.

How to Perform a Restart of an Inverter

A restart of the inverter can be performed by switching off the fuse of the inverter (or the circuit breaker of the inverter) overnight and switching it on again the next morning.

User Manual

When sunlight is insuficient, the PV inverter may continuously start up and shut down automatically due to insuficient power generation from the PV panels, which would not lead to inverter damage.

PV inverter GPRS restart

Restart over night: A restart of the inverter can be performed by switching off the fuse of the inverter (or the circuit breaker of the inverter) overnight and switching it on again the next morning.

PV inverter gprs settings

When the DC power generated by the solar array is adequate, the SOFAR 3K~6KTLM-G2 inverter will start automatically. Screen showing "normal" indicates correct operation.

Download Complete Article (PDF)

Includes full article with technical specifications and reference links

Recent Articles

Technical Documentation & Specifications

Get technical specifications, product datasheets, and installation guides for our energy storage solutions, including commercial batteries, demand management systems, DC-coupled storage, portable units, and 100kWh ESS.

Contact ELALMACÉN SOLAR

Headquarters

Calle de la Energía, 25
28001 Madrid, Spain

Phone

+34 91 234 5678 (Sales)

+34 91 876 5432 (Technical)

Monday - Friday: 9:00 AM - 6:00 PM CET